ARAMCO Services Co. - Houston Research Center

Location

Sector

Timeline

SQ. FT.

103,000 SF

Location:

Market:

Sq. Ft.

103,000 SF
This renovation added 89,000 SF of offices and 14,000 SF of labs to support ARAMCO’s Houston research operations. Specialized labs, a lead-lined X-ray suite, and upgraded amenities—including a fitness center, dining, and prayer room—enhance functionality. Phased construction enabled early turnover and uninterrupted research.

Article in Brief

  • Research space, delivered fast: The Aramco Houston Research Center renovated and expanded more than 89,000 square feet of office space and 14,000 square feet of laboratory space at 16300 Park Row in Houston.
  • Built for science: Eight laboratories, an imaging suite, and a lead-lined X-ray room for analyzing core samples support Aramco’s research work.
  • Phased for early turnover: Bartlett Cocke, Page Southerland Page, and Aramco Services Company phased design packages and construction so the owner could occupy space as quickly as possible.

Research facilities are usually defined by the discoveries made inside them. Before that work can begin, though, researchers need labs, equipment, and workspace ready to support it, and often sooner rather than later.

That was the main goal of the Aramco Houston Research Center. Bartlett Cocke General Contractors worked with Page Southerland Page and Aramco Services Company to renovate and expand the facility at 16300 Park Row, delivering more than 89,000 square feet of office space and 14,000 square feet of laboratory space.

Speed as the Primary Goal

The project’s top priority was clear from the start: provide office and laboratory space as quickly as possible.

To meet that goal, the owner, architect, and builder worked together to identify critical activities and phase the design packages. Construction could then begin on the most important parts of the project while design continued on others.

Construction was also phased to allow early turnover. Instead of waiting for the entire project to finish, Aramco could move into completed areas as they became ready.

For owners with urgent space needs, this kind of coordination can make a meaningful difference. Aligning design, procurement, and construction around the owner’s priorities helps the most important spaces come online first.

Laboratories Built for Research

At the center of the project are eight laboratories designed to support Aramco’s research.

Each laboratory includes:

  • A fume hood
  • Phoenix valves controlling exhaust
  • Lab gases
  • Lab science casework
  • Epoxy flooring

Together, these systems create a controlled, functional environment for laboratory work. Exhaust control is especially important in a lab setting, where airflow has to be managed carefully to protect the people working in the space.

A Specialized Space for Core Sample Analysis

The facility also includes a dedicated X-ray room used to X-ray core samples and determine their physical makeup.

Because the X-ray machine operates next to occupied laboratories, the room was built with lead-lined walls and doors. That shielding protects people working in adjacent spaces while the equipment is in use.

Spaces like this require close coordination between design, construction, and the owner’s operating needs. The room has to work for the research being done inside it and provide protection for everyone around it.

Workspace Designed Around People

Beyond the laboratories, the project includes imaging, office space, conference rooms, and common areas that support how research teams work together.

Interior finishes include Italian ceramic floor and wall tile, glass tile backsplashes, agile office sliding door assemblies, roll-on markerboard surfaces, and stainless steel full-concealment toilet partitions. A circular staircase and mezzanine with glass guardrails and stainless steel posts adds a distinctive feature to the interior.

The renovated auxiliary building extends that focus on employees, with a workout facility, lockers, private meeting and dining areas, and a prayer and meditation room.

A New Welcome for Employees and Visitors

The renovation also changed how people experience the building from the outside.

A new front facade and landscaping welcome employees and visitors, and a new rear entrance improves access. The exterior facade includes Rimex architectural screen wall panels from England, giving the center a distinctive appearance.

Materials sourced from England and China added another layer of coordination. On a project focused on speed, international procurement has to be planned carefully so specialty materials arrive when the schedule needs them.

What Research and Corporate Owners Can Take From the Aramco Project

Research facility projects naturally focus on laboratories and specialized equipment.

How quickly those spaces become available matters just as much.

The Aramco Houston Research Center shows how phased design and construction can help an owner get critical space into use sooner. Laboratories support the research. Specialized rooms support specific scientific needs. Offices and common areas support collaboration. Amenities support the people doing the work.

For owners planning research, laboratory, or corporate facilities, it helps to ask an important question early: Which spaces do we need first, and how can design and construction be organized to deliver them?

At the Aramco Houston Research Center, the answer was a phased approach built around early turnover, giving researchers the space they needed as quickly as possible.

FAQ's

Every project has its own story and the best way to deliver it depends on your goals. While we often use Construction Manager at Risk (CMAR) because it allows for early collaboration and strong cost control, we also bring deep experience in Design-Build, CSP, Hard Bid, Negotiated, General Contracting.

We don’t just suggest a method. We sit down with you, listen to your priorities, and work together to choose the delivery approach that sets your project up for long-term success.

Every project has its own story and the best way to deliver it depends on your goals. While we often use Construction Manager at Risk (CMAR) because it allows for early collaboration and strong cost control, we also bring deep experience in Design-Build, CSP, Hard Bid, Negotiated, General Contracting.

We don’t just suggest a method. We sit down with you, listen to your priorities, and work together to choose the delivery approach that sets your project up for long-term success.

Every project has its own story and the best way to deliver it depends on your goals. While we often use Construction Manager at Risk (CMAR) because it allows for early collaboration and strong cost control, we also bring deep experience in Design-Build, CSP, Hard Bid, Negotiated, General Contracting.

We don’t just suggest a method. We sit down with you, listen to your priorities, and work together to choose the delivery approach that sets your project up for long-term success.

Ready to Build What Matters —Together?

Planning a capital project? We’d be honored to walk alongside you, bringing people, purpose, and progress together to build what’s next.